CHANGFENG. ZHU

Work place: School of Traffic and Transportation Engineering, Lanzhou Jiaotong University, Lanzhou, China

E-mail: cfzhu003@126.com

Website:

Research Interests: Engineering

Biography

CHANGFENG. ZHU, and born in 1972. Major field of study is transportation planning and management. 1994-1998 in Lanzhou jiaotong university in Lanzhou, China, and got bachelor's degree in transportation. 2000-2003 in Lanzhou Jiaotong university in Lanzhou, China, and got master's degree in transportation planning and management. 2007 stay at CHUO university in Japan as a visiting scholar. 2008-2011 in Lanzhou Jiaotong university in Lanzhou, China, and got PH.D degree in transportation planning and management.
He has been working in Lanzhou Jiaotong university since 1998. 1998-2002 in Lanzhou Jiaotong university in Lanzhou, China, and work as teaching assistant, 2002-2007 in Lanzhou Jiaotong university in Lanzhou, China, and work as lecturer, and he has got a associate professor's qualification certificate in2007. And published Railway perishable cargo transportation in China Railway publishing House in 2008. His research interests is transportation planning and management.
Dr. Zhu receive an honor of Gansu province high-level talent in 2009, and act as reviewer for Journal of Transportation Engineering.

Author Articles
Research on Association with Freight Transit Period and Forwarding Time base on Logistics conditions

By CHANGFENG. ZHU QINGRONG. WANG

DOI: https://doi.org/10.5815/ijisa.2010.01.08, Pub. Date: 8 Nov. 2010

The whole process of freight forwarding includes multiple links. The consumption time of every link and its operational efficiency may affect the entire freight forwarding time, which can influence the transit period of freight, as well as the formulation and achievement of the transportation organizations scheme and the transportation contract. In order to analyze the existed problems in present calculation method of railway transit period, and the effects of logistics on forwarding time, on the basis of investigating and literature, Railway freight forwarding process and factor of logistics on railway freight forwarding time were analyzed, and average speed of through train, ordinary through train and high-speed train, and daily average running tariff kilometer and time were analyzed, and statistical results were exained by adopting 2χtesting method, finally, daily average running tariff kilometer and time of logistics developed and under-developed area were comparative analyzed, from which daily average running tariff kilometer and time were obtained. The analytical results show that the average speed, daily average running tariff kilometer and time respectively obeys normal distribution, the maximum difference value between the transit period calculated by present method and the practical forwarding time of freight is four 4.5 days, which show that the method can not objectively responds the freight forwarding time of each kind of freight transport product under logistics condition.

[...] Read more.
Other Articles